by BIOCIRCULAR ENERGY SYSTEMSRed and blue MAWANA Energy logoMAWANAENERGY

Approach

Start from local realities.
Move forward with method.

Feedstock, energy needs and operating constraints determine the solution. The feasibility study is the starting point.

FROM GROUND TO ACTIONUNDERSTAND ↗ DESIGN ↗ DEPLOY
01

Understanding your site

Characterise inputs, their regularity, available volumes, energy needs and site constraints.

02

Sizing and adapting

Study the appropriate configuration and its operating conditions, using a standardised method adapted locally.

03

Build, test, deploy

Plan manufacturing, testing, shipping and commissioning conditions from the design stage.

04

Preparing operations

Define monitoring, maintenance and support needs within the scope of each project.

Analyses to propose the right solution.Discover our laboratory resources, our trials and our research approach. ↗

Let's start with the right questions.

Type of waste, quantity, location and needs: a few details are enough to start a first conversation.

Describe my project